Moving the target from 90% to 95% adds one step of buffer. Moving it from 99% to 99.9% adds more than twice that step, for a tenth of the risk, and most policies were set without anybody drawing the curve.
Live result
The next point of service costs $517 a year and removes $730 of expected stockout cost.
service level you set95.0%
where the two costs meet96.7%
safety stock at that point1,116 units
days of demand it covers11.2 days
Below that point every added point of service still removes more than it costs.
Try a scenario
95.0%
909599.9
units/day
How steady demand is
days
days
$
Shown in any single currency; the arithmetic is identical.
%
$
At the balance service level: 96.733%
Safety stock
1,116 units, 11.2 days
Holding it a year
$9,822
Expected stockout cost
$2,385
Both together
$12,206
One more point costs
$730
One more point saves
$730
Field record
The policy curve is cycle service. Demand over the protection period is assumed close to normal, and one stockout has one entered cost.
What the buffer costs
Live chart
Four measures, one run
at 95.0% policy
95.0%
numerator
· cycles that end without a stockout
denominator
· 12 replenishment cycles
window
· a year
Units filled
99.6%
numerator
· units shipped from stock
denominator
· 3,000 units demanded in a cycle
window
· one cycle
Filled within 3 days
98.4%
numerator
· units served inside the threshold
denominator
· 3,000 units demanded in a cycle
window
· one cycle
Units still short
13 units · 154 a year
numerator
· units not shipped on the day asked for
denominator
· not a percentage, a count
window
· one cycle, and a year
At a 95.0% policy, 95.0% of cycles end without a stockout, 99.6% of units ship from stock, 98.4% are filled within 3 days, and about 13 units of the 3,000 in a cycle are still short.
A needs a lot size and this page models none, so the denominator here is one cycle of demand, 3,000 units. That is stated rather than assumed, because the whole argument of this page is that an undeclared denominator is not a measurement.
Live chart
What one more point costs and saves
Live chart
What the balance point is not
It is not a target and it is not a recommendation. It is the place where two of your own numbers cross, and one of them, what a stockout costs you, is usually an estimate somebody made once. Move it and the crossing moves with it, which is the most useful thing this page can show you: the argument about service level is almost always an argument about that figure, held indirectly.
It also assumes a stockout costs the same whether it lasts an hour or a fortnight, that demand and lead time are independent, and that missing a cycle costs you the same as missing the one before. None of those are true, and all of them are why the number below the curve is a starting point for a conversation rather than the end of one.
The cost of one stockout
$
$
$
$
It does not check the values in between.
Across the values sampled, where your service level sits stays below the balance point from $5,000 to $13,000, the highest value sampled. The nearest value where it changes is $4,000, where it becomes above the balance point.
Across the values sampled, where your service level sits stays below the balance point from $5,000 to $13,000, the highest value sampled. The nearest value where it changes is $4,000, where it becomes above the balance point.
The answer
below the balance point
Values sampled
$3,000 to $13,000, 11 values, step $1,000
Holds from
$5,000
Holds to
$13,000, highest sampled
Nearest value that changes it
$4,000
The answer there
above the balance point
What an unchanged region does and does not prove is set out in a short lesson.
The sweep samples only the values you entered. Between samples the answer is not checked, so read the boundary as observed, not proven.
Here is the maths
▾
The late unit threshold stays fixed at 3 days in this example.
The formula, in words
Safety stock is one number times a lookup. Combine the two sources of uncertainty into one figure, then multiply it by how many of them you want to cover; the second part is the whole of the service level decision.
The lookup is why the curve bends. Going from 90% to 95% is 0.36 of those figures. Going from 99% to 99.9% is 0.76 of them, twice as much buffer for a tenth of the risk, and nothing in the policy document says so.
A stockout has a price and almost nobody writes it down.Multiply the cycles in a year by the chance of missing one by what missing one costs.
Where the two slopes meet. One more point of service always saves the same amount and always costs more than the point before it, so they cross once, and the crossing moves when any input does.
σD=D×vwhereσDis daily demand standard deviation, Ddemand, andvthe variability factor.σL=2rwhereσLis lead time standard deviation, andrthe lead time spread.σ=L×σD2+D2×σL2whereσis combined standard deviation, andLlead time.S=z×σ=Φ−1(100s)×σwhereSis safety stock, zthe normal score for the service level, Φthe normal cumulative distribution, andsthe service level in percent.H=S×c×hwhereHis holding cost, cunit cost, andhthe annual holding rate.O=n×p×bwhereOis stockout cost, ncycles a year, pstockout probability, andbthe cost of one stockout.ΔH=ϕ(z)σ×c×h×0.01whereΔHis the cost of one more point, andϕ(z)normal density.ΔO=n×b×0.01whereΔOis the stockout saving from one more point.ℓ=ϕ(z)−z×(1−Φ(z))whereℓis normal loss.Q=ℓ×σwhereQis units short.F=(1−BQ)×100whereFis fill rate in percent, andBcycle demand.C=Φ(z+σD×τ)×100whereCis the share filled within the threshold in percent, andτthreshold days.
A worked example
Shipped defaults: 100 units a day, normal demand, lead time 30 days, spread 12, unit cost $40, holding 22%, one stockout $6,000.
σD=100×0.15=15. σL=12÷2=6. The summed variance is(30×225+10,000×36), with value366,750. σ=30×225+10,000×36=366,750=605.60units. The cost of one unit of z is605.60×40×0.22=5,329.27dollars, and that single number carries the wholecurve. Cycles a year are365÷30=12.1667, so a year of certain stockoutswould cost12.1667×6,000=73,000dollars and one point of service saves ahundredth of it,
$730, at every point on the axis.
Service level
z
Holding the buffer
Stockouts
Both
One more point costs
90%
1.28155
$6,830
$7,300
$14,130
$304
95%
1.64485
$8,766
$3,650
$12,416
$517
96.73%
1.84299
$9,821
$2,385
$12,206
$730
99%
2.32635
$12,398
$730
$13,128
$2,000
99.9%
3.09025
$16,469
$73
$16,542
$15,829
The balance point, two ways, and they must agree.Closed form:
5,329.27÷73,000=0.073004, soe−z2/2=0.3989420.073004=0.182995, wherezis the normal score. That givesz2=−2×ln(0.182995)=3.39661and thenz=1.84299. FinallyΦ(1.84299)=0.96733, so96.73%. Scan: the 100 point grid puts its lowest total at 96.7, at $12,206.45, and the totals either side of it sit above it. Both routes land on the same tenth, and that agreement is the test.
The two sentences the page exists for. The step from 90% to 95% adds 8,766−6,830=1,936dollars of buffer. The step from 99% to 99.9% adds 16,469−12,398=4,071dollars, 2.10 times as much for a tenth of the risk. A policy sitting at 99.9% carries 16,542−12,206=4,336dollars a year more than the balance point, 35.5% more, to move the chance of a stockout in any one cycle by 3.2 points. The last column is the sharper version of the same fact: a point of service costs $304 at 90% and $15,829 at 99.9%, and the saving it buys is $730 at both ends.
At 95%, normal density is 0.103145 and the normal loss is 0.020893.
Multiplying by 605.5989 gives 12.65 units short in one cycle. One cycle asksfor100×30=3,000units, so the fill rate is 99.6%. Allowing a late unit3 days shifts z by100×3÷605.5989=0.49538, taking the reading to98.4%. Across365÷30=12.1667cycles, 12.65×12.1667gives 153.9 unitsstill short in a year.
What this does not model
Order quantity and its cost, review period, lost sales against back orders, partial stockouts, a stockout cost that grows with its length, correlated demand and lead time, supplier allocation in a shortage, obsolescence, and the fact that a service level measured on cycles is not the fill rate most people mean when they say service level.
The four readings are not combined and there is no fifth number under them. Cycle service and fill rate answer different questions, and averaging two answers to two questions produces an answer to neither.
Equation trace
Combine daily demand spread and lead time spread into one protection period deviation.
Convert the named cycle service level into its normal distribution value.
Multiply that value by the combined deviation to obtain safety stock.
Calculate annual holding cost and expected stockout cost on the same inputs.
Compare the cost and saving of the next service point.
Boundary
The calculation treats service as cycle service for the policy curve, assumes demand over the protection period is close to normal, and assigns one fixed cost to a stockout. It does not set a target or equate cycle service with fill rate.
Source anchors
Foundations of Inventory Management. The published book provides context for service measures, safety stock, and continuous review inventory policy.
Calculation version
1.0.0
The whole record prints. Your browser can save it as a PDF instead of printing it.
It draws the service curve and marks where two marginal costs meet on the figures you type. It describes the arithmetic and does not set inventory policy.