Skip to contentTools
- Factory shutdowns: the closures your schedule assumes are openCalculator · 1 min
- Air and sea breakeven: the point where speed pays for itselfCalculator · 2 min
- Cost of payment terms: a share of the unit priceCalculator · 2 min
- Bid levelling: every quote on one landed cost per unitCalculator · 4 min
- Container utilisation: will it fit, and what runs out firstCalculator · 3 min
- Chargeable weight: the same divisor gives two totalsCalculator · 4 min
- Allocation basis: value preserves the price orderCalculator · 4 min
- Contacting stages: a second ideal contact can add nothingCalculator · 4 min
- Setup load: the fast cycle still falls shortCalculator · 3 min
- Reorder point: which of the four stock numbers the policy comparesCalculator · 4 min
- Documentary credit deadlines: four clocks, and one of them is yoursCalculator · 3 min
- Pallet patterns: the bottom carton decides between two layer buildsCalculator · 4 min
- Connection window: the next sailing sets the price of a missCalculator · 4 min
- Backward scheduling: the tightest document is not always the slowest oneCalculator · 3 min
- Reference state: two property tables, one hidden offsetCalculator · 3 min
- Port productivity: one call, three clocks, three readingsCalculator · 3 min
- Decimal separator: the same digits, two readingsCalculator · 2 min
- Spend weighted average: one supplier closes the whole gap, until none canCalculator · 3 min
- Kraljic matrix: a low value part with one source is not routineCalculator · 4 min
- Derating factors: the drum rating is not the rating in the trayCalculator · 4 min
- Free time: six days or ten, on the convention you declareCalculator · 4 min
- Value of information: a check pays only when it changes an actionCalculator · 4 min
- Amount of substance: the larger volume can be the smaller amountCalculator · 3 min
- Multiple steady states: the branch depends on which way you arrivedCalculator · 5 min
- First in first out: the record says oldest, the yard newestCalculator · 4 min
- Hijri anniversary: three years in Hijri months end thirty three days earlyCalculator · 4 min
- Working week: four declared weeks give four dates from one ThursdayCalculator · 4 min
- Common cause dependency: three qualified sources, and one week leaves oneCalculator · 4 min
- Continuity rule: the bar runs thirty days, ten of them workedCalculator · 3 min
- Date constraint: the delay in front of the date stopped travellingCalculator · 4 min
- Windows analysis: nothing in the record changed and the count didCalculator · 5 min
- Time and money: an event passes one gate and fails the otherCalculator · 5 min
- Approval lead time: the change is one delay, the answer anotherCalculator · 4 min
- Double counting: one crew, and the same hours in the total twiceCalculator · 5 min
- Supplier fixed cost: the lowest line prices give the highest billCalculator · 3 min
- Guard band: the measurement did not move and the three rules disagreedCalculator · 3 min
- Rules of origin: one consignment, three declared tests, and they disagreeCalculator · 3 min
- Notice period: the later of two dates is the shorter periodCalculator · 3 min
- Delay analysis methods: the records carry them, the software does notCalculator · 5 min
- Bank guarantee run-off: the work is done, the bond stands in fullCalculator · 5 min
- Allocation rules: six hundred units arrived, two locations still shortCalculator · 4 min
- Round trip time: the year holds seven trips, the eighth falls shortCalculator · 5 min
- Lumped capacitance: after ten hours one packing is still under its limitCalculator · 4 min
- Blending index: at fifty per cent the two rules disagreeCalculator · 3 min
- Rate controlling step: halving the particle moves nothing, doubling the velocity doesCalculator · 4 min
- Walk-aways first: the middle of the zone is not the middle of the openingsCalculator · 3 min
- Shared delivery route: each segment is charged to whoever needs it drivenCalculator · 4 min
- Lot split ratios: ten lots read 1.6 bidders per lot if they compete and 0.5 if they shareCalculator · 3 min