Order 1
60 days11 December 2026
Adding days alone gives 11 December 2026.
No days added
No estimated windows crossed
Chinese New Year, Eid and Golden Week close the factories your schedule assumes are open. This puts them back in the date.
Calendar compiled 24 August 2026Confirmed windows come from published national holiday decrees. Islamic dates are calculated and are settled by moon sighting, so they can move by a day. China's 2027 decree is normally published in early November. Until then, the 2027 China windows here are estimates.
Dates outside 2026 and 2027 fall outside the calendar this page carries.
This is production time at the factory. Transit and customs sit on top of whatever comes out below.
Where it is made
Which future you are counting
Each option is a named future, not a confidence level. Nothing here is weighted and nothing is blended.
Output falls before the holiday as staff leave early.
Some staff do not come back at all. Two to three weeks is common.
Decrees only
11 December 2026
Decrees and the usual pattern
11 December 2026
A longer estimate
11 December 2026
Decrees are a date somebody published. The wind down, the restart and the Ramadan hours are a pattern somebody observed, and a decree that has not been issued yet is neither. This page keeps them in separate columns because they are separate kinds of knowing.
Windows inside this order's span. Open a row for the operational context and source.
No shutdown windows fall inside this order's span.
In 2026, this calendar shows 24 closed days and 17 reduced output days for China.
Full bars are ordinary . Thin bars show reduced output, and gaps show closures. Solid outlines mark confirmed windows. Hatched outlines mark estimates.
Calendar year
Inspect from a window start
Each preset uses the exact start date carried in this dataset. Selecting one updates the order timeline above.
The selected order date is 12 October 2026.
These three orders run from 11 December 2026 to 26 February 2027 after the same factory calendar is applied to each quote.
Wave spacing
The quoted dates span 60 days. The factory calendar spreads them 17 days farther apart, to 77 days.
The least affected quote carries 0 days of calendar delay. The most affected carries 17 days because it crosses more of the year.
Set three lead times
Order 1
60 days
Uses the quoted lead time above.
11 December 2026
Adding days alone gives 11 December 2026.
No days added
No estimated windows crossed
10 January 2027
Adding days alone gives 10 January 2027.
No days added
No estimated windows crossed
26 February 2027
Adding days alone gives 9 February 2027.
+17 days from shutdowns
3 estimates crossed
All three orders use 12 October 2026 and the same origin, ramp, and slowdown assumptions.
A 60 day lead time quoted on 20 December 2026 for a Chinese supplier gives 18 February 2027 when the days are added. Walking the calendar, the order runs into a 7 day slowdown before the lunar new year. That loses 3.5 days of production, the closure loses 9 days, and the 7 day return at 40% output loses 4.2 days. The realistic date is 7 March 2027, which is 17 days later.
Those 3 Chinese New Year windows are all estimated in 2027. They remove 3.5 days, 9 days, and 4.2 days of production, or 16.7 days in total. The closure is the largest estimated movement. This split measures modelled lost production, not the probability of the estimate being right.
For 3 orders quoted at 60, 90, 120 days from the same 20 December 2026 date, the dates found by adding days run from 18 February 2027 to 19 April 2027, a span of 60 days. The factory dates run from 7 March 2027 to 11 May 2027, a span of 65 days. The calendar therefore adds 5 days to the spacing because the longest order also crosses Labour Day.
The estimate boundary adds the lost production inside crossed estimated windows. It keeps published and unpublished dates separate, but it does not create a confidence interval. The wave reading compares the earliest and latest dates across the three orders before and after the same calendar is applied. A positive spacing change means later orders cross more disruption than earlier ones.
Weekends and standard rest days, provincial and regional holidays, your supplier's own works holiday, capacity that was already sold to someone else before the shutdown, raw-material lead times sitting behind your order, transit, customs, and the freight capacity crunch that surrounds every major closure. It also does not know your supplier. Two factories in the same city close for different lengths of time, and the only reliable source for which is the factory.
Windows marked confirmed are taken from published national holiday decrees. Windows marked estimated are one of three things: a decree that has not been issued yet, an Islamic date that is calculated but settled by moon sighting, or a convention such as the European August shutdown that no authority publishes at all. The page never promotes an estimate to a confirmation, and the hatched fill is the signal, not the colour.
Counting only decrees is the narrow reading and counting the usual pattern is the wide one; both are printed, and choosing between them is a judgement about your supplier rather than about this calendar.
The whole record prints. Your browser can save it as a PDF instead of printing it.
Public holiday dates are compiled from published decrees where they exist and estimated where they do not. Islamic holidays are settled by moon sighting and can move by a day in either direction; Ramadan slowdowns and the European August shutdown are conventions rather than published closures, and China's 2027 decree has not been issued at the time this was compiled. This page describes a pattern. It does not know your supplier's plan, and it is not a substitute for asking them. Confirm every shutdown with the factory before you commit to a date.