Continuity rule: the bar runs thirty days, ten of them worked

An activity records an actual start and an actual finish, and the drawing fills every date between them. Type the dated observations you hold and the filled span comes apart, 30 days of bar over 10 worked days, with a 20 day gap the record does not cover and a probe date that reads as worked on the drawing and not worked in the observations. The same output over those two denominators gives 10 units a day and 30, and nothing here reconstructs what happened inside the gap.

Live result

The dated record leaves a 20 day gap inside a bar the drawing fills end to end.
  • days in the filled bar30 days
  • days the record supports10 days
At the probe date the drawing reads worked and the dated record does not.
The dated record leaves a 20 day gap inside a bar the drawing fills end to end.At the probe date the drawing reads worked and the dated record does not.

The typed record

Filled activity bar compared with dated worked segmentsThe filled bar covers 30 civil days. The dated observations mark 10 worked days and leave 20 days empty. On 2026-01-15, the filled bar reads worked and the dated record reads not worked.Filled drawingDated observationsrecorded gapprobe2026-01-012026-01-30

Try a scenario

Same scope and information cut

Both records need to describe the same activity and the same information cut before their dates can be compared.

units

Dated worked segments

Segment 1

Segment 2

At least one dated worked segment is required.

The rule and its breaker

The rule is commonly stated as follows: a recorded actual start and actual finish mean the activity was worked throughout every date between them.

The smallest breaker spans 1 March through 3 March. Work is observed on 1 March and 3 March, so the drawing fills 3 days while the dated record supports 2 and leaves a 1 day gap.

The rule is restored when dated observations cover every civil date in the span, either as one continuous segment or as adjacent segments with no missing date.

The computable witness

Days in the filled bar
30 days
Observed worked days
10 days
Days not supported as worked
20 days
First date not supported as worked
2026-01-06
Interruptions
1
Drawing at the probe
worked
Dated record at the probe
not worked
Output per bar day
10 units a day
Output per observed worked day
30 units a day

What does not break the rule

One continuous thirty day observation covers the whole bar, so the gap is zero.

Two adjacent observations from 1 February through 5 February and 6 February through 10 February still cover all ten days.

Boundary

It compares a filled two endpoint bar with dated observations typed for the same activity, without reconstructing history, verifying work, finding concurrence, assigning cause, or deciding entitlement.

Here is the maths

▾

The formula, in words

Count civil dates inclusively from actual start through actual finish. Count every date inside the nonoverlapping worked segments. The difference is the unsupported gap. Divide the same output once by bar days and once by observed worked days.

G=B−WG=B-WG=B−W

where GGG is gap days, BBB inclusive bar days, and WWW the union of observed worked days.

A worked example

From 1 January through 30 January there are 30 inclusive days. The two five day observations support 10 days, so the gap is 20 days. Output of 300 gives 10 units per bar day and 30 units per observed worked day.

30−10=20300÷30=10300÷10=3030 - 10 = 20\qquad 300 \div 30 = 10\qquad 300 \div 10 = 3030−10=20300÷30=10300÷10=3030−10=20300÷30=10300÷10=30\begin{gathered}30 - 10 = 20 \\ 300 \div 30 = 10 \\ 300 \div 10 = 30\end{gathered}30−10=20300÷30=10300÷10=30​

What this does not model

The arithmetic does not infer work between observations, verify any observation, test concurrence, assign responsibility, establish cause, or decide entitlement.

Source basis

The witness uses public civil date subtraction, interval union and division. It reproduces no definition or wording from sold guidance.

The whole record prints. Your browser can save it as a PDF instead of printing it.

A two endpoint bar has no supported interior, and this witness will not guess one.

Related

  • Concurrent delay: two delays at once, five different answersAn employer delay and a contractor delay land on the same three weeks. The facts do not change and neither do the dates, but every analysis method awards a different number of days.
  • Schedule update analysis: the update moved six days, the calculation forty twoThe last programme forecast completion on 16 March and the new one forecasts 10 March, so the two issued programmes sit six days apart. Recorded progress on its own moved the date eighteen days later, and the revisions moved it twenty four days the other way. Forty two days of movement, six days of it visible, and the calculation that sits between the two programmes is the only place the difference shows.

Filled bar witness record

Continuity rule: the bar runs thirty days, ten of them worked

Accepted inputs

Actual start
2026-01-01
Actual finish
2026-01-30
Output quantity
300 units
Probe date
2026-01-15
Segment 1
2026-01-01 to 2026-01-05
Segment 2
2026-01-26 to 2026-01-30

Witness

Days in the filled bar
30
Observed worked days
10
Days not supported as worked
20
Output per bar day
10
Output per observed worked day
30

Record fields

Calculation version
1.0.0
Boundary
It compares a filled two endpoint bar with dated observations typed for the same activity, without reconstructing history, verifying work, finding concurrence, assigning cause, or deciding entitlement.
Source basis
The witness uses public civil date subtraction, interval union and division. It reproduces no definition or wording from sold guidance.

A two endpoint bar has no supported interior, and this witness will not guess one.

Badr Alghamdi · badralghamdi.com/tools/gap-inside-the-bar